Southland

$2.94bn

Total Value of Project Pipeline (2025 to 2027)

4,054

Average Workforce Size (2025 to 2027)

-53.4%

Peak Supply/Demand Gap (2025 to 2027)

WORKFORCE DEMAND IN THE REGION

Workforce demand in Southland

Reading the heatmap: 

Each district is colour-coded by the maximum workforce supply Vs demand gap over the next three years (2025-27). This forecast is impacted by construction and infrastructure work in planning for this region, over the same period. 

Check out today's figures at the Construction & Infrastructure Workforce Information Platform. 

WIP logo - Construction & Infrastructure Workforce Information Platform NZ

2025 Regional Insights

The key areas covered for the region include:

  • Project pipeline​

  • Key regional projects​

  • Building consent trends​

  • Regional Population impacts

  • Workforce supply and demand gaps​

  • Project Pipeline by Iwi Māori boundary

  • Learner trends

2022 Regional Report

Cover of regional report for Southland

Information about the report specific to this regional group. 

Downloads as a pdf file.

bottom of page